Lifting onto industrial roofs
Installing solar panels on industrial roofs by helicopter
Helicopter lifting of solar panels and equipment onto large industrial roofs, where conventional lifting methods are slow and expensive.
A helicopter puts the panels on the roof quickly and safely, which lowers the risk of damage to both the panels and the building.
Installing solar panels on an industrial roof is demanding work, and the hardest part is usually getting the panels up there at all. A helicopter is an effective answer: it lifts and places the panels quickly and safely, which lowers the risk of damage to the panels and to the building. It pays off most on large industrial roofs, where conventional lifting is slow and expensive. With experienced pilots and careful planning, a helicopter lift shortens the installation and makes the whole project cheaper to run.
Solar panels for business: what a helicopter lift changes
For a company investing in solar on a large industrial roof, the logistics are usually the constraint rather than the panels. A helicopter removes the constraint: there is no crane to assemble, no road closure to arrange and no need to route heavy equipment through a working site. Installation time drops, disruption to the business below drops with it, and the roof reaches generating capacity sooner – which is where the return on the investment actually comes from.
Getting panels and equipment onto a large roof
The lift itself is planned around the roof. Panels are made up into loads sized for the aircraft, flown in sequence and set down where the installation team needs them, rather than at a single ground-level drop point. Inverters, mounting rails and ballast go the same way. On a large or awkward roof this is what saves the time: material arrives at the point of work, so the team fits panels instead of moving them.
See also our page on helicopter lifting.
Solar panel lifting at a glance
- Use
- Solar panels and equipment onto industrial roofs
- Maximum lifting capacity, H125
- 1,400 kg
- Practical load, H125
- 1,200 kg
- Maximum lifting capacity, Bell 205/UH-1H
- 1,750 kg
- Area of operation
- All of Sweden and Europe
- Fleet
- 34 helicopters
- Certifications
- AOC · ATO · CAMO · Part-145
More lifting services
Related lifting services.
-
Helicopter lifting
The service in full – capacity, cost and how a lift is planned.
-
Helicopter lifting Gothenburg
Lifting in Gothenburg and on the west coast.
-
Helicopter lifting Stockholm
Lifting in the Stockholm area.
-
Material lifting Gothenburg
Material transport to sites that are hard to reach in the Gothenburg area.
-
Material lifting Stockholm
Material transport in the Stockholm area.
-
Transporting building materials by helicopter
Building materials to islands, mountains and urban sites where roads are not enough.
-
Moving a house by helicopter
Lifting power, permits and which buildings can be moved.
-
Crane truck Stockholm
When the street cannot take the load – the helicopter as an alternative to a crane truck.
-
How much can a helicopter lift?
Lifting capacity by helicopter type and what affects it.
-
Helicopter lift vs. mobile crane
Which lifting solution suits which project.
-
Lifting, construction and civil engineering
The service page for lifting work in construction and civil engineering.
Do you have solar panels to get onto an industrial roof?
Tell us where the roof is, how many panels and the timescale, and we will come back with a plan.